UPDM 1.0 NO IDEA Avatar
  1. OMG Issue

UPDM — Concern/ Stakeholder/ StakeholderConcern

  • Key: UPDM-326
  • Legacy Issue Number: 11972
  • Status: open  
  • Source: Anonymous
  • Summary:

    ยท The relationship between these entities seems far from clear. A concern is an extension of UseCase and is associated with a Stakeholder as well as an ArchitectureView. A stakeholder is also associated with an architecture view and the relationship between Stakeholder and concern is stereotypes as StakeholderConcern. It would therefore seem that connections to ArchitectureView exist both through the concern and from the stakeholder directly. Is this really required?

  • Reported: UPDM 1.0b1 — Fri, 28 Dec 2007 05:00 GMT
  • Updated: Fri, 6 Mar 2015 20:59 GMT