UPDM 1.0 NO IDEA Avatar
  1. OMG Issue

UPDM — 8.6.3.3 Description

  • Key: UPDM-279
  • Legacy Issue Number: 11918
  • Status: open  
  • Source: Dassault Systemes ( Mr. Andrius Strazdauskas)
  • Summary:

    A communications link is a single physical connection from one system (or node) to another. A communications path is a
    (connected) sequence of communications systems and communications links originating from one system (or node) and
    terminating at another systems (or node)."

    The OCL does not allow SystemsNodes to be linked, but description says so.

  • Reported: UPDM 1.0b1 — Thu, 27 Dec 2007 05:00 GMT
  • Updated: Fri, 6 Mar 2015 20:59 GMT