-
Key: BPMN21-86
-
Legacy Issue Number: 15284
-
Status: open
-
Source: BPM Advantage Consulting ( Dr. Stephen White)
-
Summary:
When a Choreography is included in a Collaboration, the spec says that Message Flow can be "wired up" to Choreography Tasks. This needs to be defined better. Are the objects connected or overlapping? What if the Choreography Task moves, etc.
-
Reported: BPMN 2.0 — Tue, 8 Jun 2010 04:00 GMT
-
Updated: Fri, 6 Mar 2015 20:57 GMT
BPMN21 — Clarify Relationship between Collabration Message Flow and Choreography Tasks
- Key: BPMN21-86
- OMG Task Force: BPMN 2.1 RTF