-
Key: BPMN21-191
-
Legacy Issue Number: 15588
-
Status: open
-
Source: craftware.net ( Eduardo Jara)
-
Summary:
Paragraph:
“If the details of the called Process are available, then the shape of the Call Activity will be the same as a expanded Sub-Process, but the boundary of the shape MUST have a thick line (see Figure 10.41).”This paragraph should be a sub-bullet of “If the Call Activity calls a Process, then there are two (2) options:”, because it describes the second option.
-
Reported: BPMN 2.0 — Sat, 18 Sep 2010 04:00 GMT
-
Updated: Fri, 6 Mar 2015 20:57 GMT