-
Key: BPMN21-176
-
Legacy Issue Number: 15556
-
Status: open
-
Source: craftware.net ( Eduardo Jara)
-
Summary:
Figure 11.47.
Participant B: The Parallel Gateway has a “decision”, and its outgoing Sequence Flows have “conditions”.
It is a mistake. “A Parallel Gateway creates parallel paths without checking any conditions; each outgoing Sequence Flow receives a token upon execution of this Gateway.” (p. 302).
Then, words “Decision?”, “Yes” and “No” should be removed.
-
Reported: BPMN 2.0 — Fri, 17 Sep 2010 04:00 GMT
-
Updated: Fri, 6 Mar 2015 20:57 GMT
BPMN21 — Page 370. Wrong Parallel Gateway in Figure 11.47
- Key: BPMN21-176
- OMG Task Force: BPMN 2.1 RTF