Summary:
a) Section 7. Page 21.
It says
“BPMN provides a multiple diagrams, which are designed for use by the people who design and manage Business Processes.”It should say
“BPMN provides multiple diagrams, which are designed for use by the people who design and manage Business Processes.”“a multiple” should be replaced by “multiple”
----------------------------------------------------------b) Section 7.2.2. Page 34.
In table 7.2. Row “Conditional flow”
It says
“A Sequence Flow can have a condition Expression that are evaluated at runtime ”It should say
“A Sequence Flow can have a condition Expression that is evaluated at runtime ”“that are evaluated” should be replaced by “that is evaluated”
----------------------------------------------------------c) Section 7.2.2. Page 34.
In table 7.2. Row “Default flow”
It says
“These Sequence Flows will have a diagonal slash will be added to the beginning of the connector ”It should say
“These Sequence Flows will have a diagonal slash added to the beginning of the connector ”“slash will be added” should be replaced by “slash added”
----------------------------------------------------------d) Section 7.2.2. Page 36.
In table 7.2. Row “Fork”.
It says
“This represents “uncontrolled” flow is the preferred method for most situations.”It should say
“This represents “uncontrolled” flow which is the preferred method for most situations.”“flow is” should be replaced by “flow which is”
----------------------------------------------------------e) Section 7.2.2. Page 39.
Table 7.2. Row “Mutiple Instances”.
It says
“A set of three (3) horizontal liness will be displayed at the bottom-center of the activity for sequentail Multi-Instances (see upper figure to the right). A set of three (3) vertical liness will be displayed at the bottom-center of the activity for sequentail Multi-Instances (see lower figure to the right).”It should say
“A set of three (3) horizontal lines will be displayed at the bottom-center of the activity for sequential Multi-Instances (see upper figure to the right). A set of three (3) vertical lines will be displayed at the bottom-center of the activity for parallel Multi-Instances (see lower figure to the right).”“horizontal liness” should be replaced by “horizontal lines”
first “sequentail Multi-Instances” should be replaced by “sequential Multi-Instances”
“vertical liness” should be replaced by “vertical lines”
second “sequentail Multi-Instances” should be replaced by “parallel Multi-Instances” -