-
Key: WFMF12-11
-
Legacy Issue Number: 2085
-
Status: closed
-
Source: Anonymous
-
Summary:
Summary: Figure 1-3, Workflow Reference Model, does not provide a reasonable
representation of the resource manager concept which is a generalization
of the work list concept. The associated text needs work also.This overview material, as it is currently positioned in the proposal,
would probably not be part of the published specification since it is
under design rationale, which appears to be a justification for the
submission rather than the specification per se. It should be revised
to be an appropriate overview included in the final specification. Some
of the other material in Section 1 should also be adapted and included. -
Reported: WfMF 1.1 — Thu, 15 Oct 1998 04:00 GMT
-
Disposition: Resolved — WfMF 1.2
-
Disposition Summary:
Duplicate of issue 2040 and therefore closed
-
Updated: Fri, 6 Mar 2015 20:59 GMT