UML 2.2 RTF Avatar
  1. OMG Issue

UML22 — Section: 12.3.6 & 12.3.19

  • Key: UML22-741
  • Legacy Issue Number: 8237
  • Status: closed  
  • Source: U. S. Geological Survey ( Jane Messenger)
  • Summary:

    I'm confused. Fig. 178 shows ActivityFinalNode as a child of ControlNode in the BasicActivities sub-package, but in fig. 183 it is a "grandchild" of ControlNode and a child of FinalNod in the IntermediateActivities sub-package. Can a concept be both a child and a grandchild of the same higher-level concept, in this case ControlNode?

  • Reported: UML 2.0 — Fri, 4 Feb 2005 05:00 GMT
  • Disposition: Resolved — UML 2.1
  • Disposition Summary:

    No Data Available

  • Updated: Fri, 6 Mar 2015 20:58 GMT