-
Key: UAF12-16
-
Status: closed
-
Source: Akademiska sjukhuset ( Hans Natvig)
-
Summary:
The view specifications Operational Structure and Resources Structure should be consistent with each other. Why does the former include OperationalParameter but the latter does not include ResourceParameter? Also, OperationalActivity is included in the former but Function is omitted in the latter.
-
Reported: UAF 1.0 — Mon, 26 Aug 2019 09:44 GMT
-
Disposition: Resolved — UAF 1.2
-
Disposition Summary:
ResourcesStructure diagram made consistent with OperationStructure diagram
ResourcesStructure diagram made consistent with OperationStructure diagram by adding Function and IsCapableToPerform.
-
Updated: Thu, 31 Mar 2022 19:31 GMT
-
Attachments:
- class__Resources_Structure.svg 876 kB (image/svg+xml)
- class__views__Resources_Structure.svg 301 kB (image/svg+xml)
UAF12 — Inconsistencies in view specifications
- Key: UAF12-16
- OMG Task Force: Unified Architecture Framework (UAF) 1.2 RTF