-
Key: UAF11-107
-
Status: closed
-
Source: INCOSE ( Mr. Matthew Hause)
-
Summary:
OV-1c and SV-7 are better fits for Pm-Me, rather than Pm-En. The UPDM views were responsible for showing performance attributes, which doesn’t really have anything to do with defining environments (though the performance attributes would contain environmental properties as well as other properties).
-
Reported: UAF 1.0 — Sat, 13 Jan 2018 04:33 GMT
-
Disposition: Closed; No Change — UAF 1.1
-
Disposition Summary:
OV-1c and SV-7 are better fits for Pm-Me
Looking into UAF traceability document it is exactly the same mapping as requested. However, there is a problem with Figure 6.3 - Overlay of MODAF Views onto UAF/P Grid that needs to be updated.
the table looks ok to me GJB
-
Updated: Tue, 8 Oct 2019 17:49 GMT
UAF11 — OV-1c and SV-7 are better fits for Pm-Me.
- Key: UAF11-107
- OMG Task Force: Unified Architecture Framework (UAF) 1.1 RTF