    I'm trying to map the assocations in Figure 11-3 "Decomposition of
    WorkDefinition" to those in Figure 7-1 "Process Structure Package" and I
    have 3 questions:

    1. WorkDefinition has a direct association to itself in Figure 7-1 and
    Operation (to which WorkDefinition is mapped) in Figure 11-3 does not
    seem to have such direct corresponding association. Does this
    association map to
    Operation->ActivityGraph->CompositeState->ActionState->CallAction->Operation
    in Figure 11-3 ?

    2. If the answer to the above question is yes then this question is: the
    self-assocation of Operation in Figure 11-3 passes through ActionState
    (to which Step from Figure 7-1 is mapped to) but the self assocation of
    WorkDefinition in Figure 7-1 does not seem to pass through Step, why ?

    3. Step in Figure 7-1 is mapped to ActionState in Figure 11-3 and Step
    doesn't seem to have any sub-component. In Figure 11-3 ActionState has a
    composition assocation with Action (+entry), what does this represent ?

  • Reported: SPEM 1.0b1 — Wed, 20 Mar 2002 05:00 GMT
  • Disposition: Resolved — SPEM 1.0
  • Disposition Summary:

    Accept.