Key: IEFRA_-84
-
Status: closed
-
Source: Advanced Systems Management Group Ltd. ( Mr. Michael Abramson)
-
Summary:
OMG Issue:
IEFRA-1
Unfortunately a further correction is needed (probably because of Word). The fragments are case sensitive so “Ptc” needs to be replaced with “ptc” for both Annex A and B, e.g. both “Ptc/2018-05-21“ and “Ptc/2018-05-22” need to be fixed.Also please note that the FTF report says to use mars/2017-05-03 and use mars/2017-05-04 in the summary section – this should be fixed in the report to avoid confusion.
-
Reported: IEF-RA 1.0b1 — Sat, 29 Dec 2018 02:40 GMT
-
Disposition: Resolved — IEF-RA 1.0
-
Disposition Summary:
Resolution to IEFRA-84
Issue generated from FTF 1 Report Comments.
Unfortunately a further correction is needed (probably because of Word). The fragments are case sensitive so “Ptc” needs to be replaced with “ptc” for both Annex A and B, e.g. both “Ptc/2018-05-21“ and “Ptc/2018-05-22” need to be fixed.
Also please note that the FTF report says to use mars/2017-05-03 and use mars/2017-05-04 in the summary section – this should be fixed in the report to avoid confusion.
This was a MSword auto correct missed in the final review.
-
Updated: Tue, 8 Oct 2019 17:56 GMT
IEFRA_ — Correct Document Numbers in Annex A and B
- Key: IEFRA_-84
- OMG Task Force: IEF Reference Architecture 1.0 FTF 2