- 
                            Key: DTV11-70
 - 
                            Legacy Issue Number: 18950
 - 
                            Status: closed
 - 
                            Source: General Electric ( Mark Linehan)
 - 
                            Summary:
In clause 9.0 of the Date-Time Vocabulary, the vocabulary entry for the "Duration Values Vocabulary" has "Included Vocabulary: Duration Values Vocabulary". Per diagram 7.3, it should be "Included Vocabulary: Time Infrastructure Vocabulary".
An extension of the same issue:In clause 10.0, the vocabulary entry for the "Calendars Vocabulary" has "Included Vocabulary: Calendars Vocabulary". It should have "Included Vocabulary: Time Infrastructure Vocabulary".
In clause 11.0, the vocabulary entry for the "Gregorian Calendars Vocabulary" has "Included Vocabulary: Gregorian Calendars Vocabulary". It should have "Included Vocabulary: Calendars Vocabulary".
 - 
                            Reported: DTV 1.0 — Sun, 22 Sep 2013 04:00 GMT
 - 
                            Disposition: Resolved — DTV 1.1
 - 
                            Disposition Summary:
as described. These are editorial errors. The changes to clause 11.1 are incorporated in the resolution to Issue 18961, which changes the “included vocabularies”.
 - 
                            Updated: Fri, 6 Mar 2015 20:58 GMT
 
DTV11 — DTV Issue: Included Vocabulary is wrong for Duration Values Vocabulary
- Key: DTV11-70
 - OMG Task Force: DateTime Vocabulary (DTV) 1.1 RTF