Summary:
In the figure 9-2 (DPM), there is a confusing arrow from "Dependability Argument Construction" to "Dependability Requirements Definition" specified. The arrow should be from "Dependability Argument Construction" to the diamond (judgement block" in the top left corner of the figure so that the arrow can be connected to "Dependability Analysis".
-
Reported: DAF 1.0b1 — Tue, 12 May 2015 06:29 GMT
-
Disposition: Resolved — DAF 1.0
-
Disposition Summary:
The arrow is to be removed
The arrow is going to be removed because the arrow is misleading as if the "Dependability Requirements Definition" process requires an input from the "Dependability Argumentation Construction" process which is a downstream process of the "Dependability Requirements Definition".
-
Updated: Tue, 22 Dec 2015 15:04 GMT