• Key: DAF-5
  • Legacy Issue Number: 19707
  • Status: closed  
  • Source: Architecture Technology Institute ( Hiroshi Miyazaki)
  • Summary:

    There are some multiple incoming arrows to activities.
    Multiple incoming arrow means parallel merge.
    In this case, loop-back arrow and initial arrow
    are merged.
    This means initial arrow (flow) should wait results
    of subsequent arrow(flow).
    It is impossible to perform this diagram.

  • Reported: DAF 1.0b1 — Fri, 9 Jan 2015 05:00 GMT
  • Disposition: Resolved — DAF 1.0
  • Disposition Summary:

    *The multiple incoming arrows are going to be assigned appropriately. *

    All activities with more than one incoming arrow are replaced with loop structure or exclusive-or. Figure 9-3 and 9-4 also had the same problem so we fixed and attached. The diagrams attached have a defect, which does not show the loop marker in pdf format. It appears that the tool we use has a bug, which does not produce the correct diagrams.

  • Updated: Tue, 22 Dec 2015 15:04 GMT
  • Attachments: