-
Key: BPMN2-64
-
Legacy Issue Number: 14339
-
Status: closed
-
Source: Trisotech ( Mr. Denis Gagne)
-
Summary:
Reported by dga...@trisotech.com, Jul 29, 2009
In the structural specifications under "Activity Boundary Connections" the
list of Intermediate Events that can be attached is provided (second
structural spec.).
In the structural specifications under "Sequence Flow Connections" the
same list is provided (first sttructural spec.).
Is it required to duplicate the list?The content of the list is different, Escalation is not included in the
second list. -
Reported: BPMN 2.0b1 — Fri, 4 Sep 2009 04:00 GMT
-
Disposition: Resolved — BPMN 2.0
-
Disposition Summary:
Remove redundant text from the Sequence Flow considerations of an Intermediate Event.
(a) Section 10.4.4, Sub-Section "Sequence Flow Connections," page 237 (267 pdf): Remove first bullet in section
(b) Section 10.4.4, Sub-Section "Sequence Flow Connections," page 237 (267 pdf): Change indent level to the left for the next bullet (after removing the first bullet -
Updated: Fri, 6 Mar 2015 20:57 GMT