-
Key: BPMN2-318
-
Status: open
-
Source: - ( Sebastian Handwerker)
-
Summary:
I found a mistake in the BPMN 2.0.2 specification.
https://www.omg.org/spec/BPMN/2.0.2/PDF
On Page 37:
"The attributes of Tasks and Sub-Processes will determine if they are repeated or performed once (see page 190). A set of three horizontal lines will be displayed at the bottom-center of the activity for sequential Multi-Instances (see upper figure to the right).
A set of three vertical lines will be displayed at the bottom-center of the activity for SEQUENTIAL Multi-Instances (see lower figure to the right)."The second "sequential" is wrong. The vertical lines are for PARALLEL Multi-Instances.
The corrected form is the following:
"The attributes of Tasks and Sub-Processes will determine if they are repeated or performed once (see page 190). A set of three horizontal lines will be displayed at the bottom-center of the activity for sequential Multi-Instances (see upper figure to the right).
A set of three vertical lines will be displayed at the bottom-center of the activity for PARALLEL Multi-Instances (see lower figure to the right)." -
Reported: BPMN 2.0.2 — Mon, 2 May 2022 20:54 GMT
-
Updated: Tue, 3 May 2022 16:55 GMT