-
Key: BPMN11-58
-
Legacy Issue Number: 10150
-
Status: closed
-
Source: Axway Software ( Dale Moberg)
-
Summary:
What are the states that an activity can transition to? Are these the values of the Status attribute of an Activity? (None, Ready, Active, Cancelled, Aborting, Aborted, Completing, Completed) What, if anything, causes a transition of an Activity from None to Ready? Can you transition from Completed to None? to Ready? And so forth.
In what ways can these transitions occur? I think this is mainly a matter of what effects events have, but also involves the flows (and gateways, and tokens) [See the summary of start event types and their triggers (Table 9.5) and end events and process “endings” (Table 9.6) that has some info on effects on state, though some additional values appear to be mentioned.]
If there are other states (“armed” “ready”, “listening”, “waiting” “dormant”, “inactive” and so on) list them along with basic ones such as
“started” (“instantiated” “activated”) and completed. Are some states synonymous? Which ones? Is singly/multiply instantiated a state (so that an instantiated count could be tracked by numbers of copies active in the system?) How would the above states, if they exist, be related to the value in LoopType, StartQuantity, etc.Bonus: Link the state machine transistions to the token flow behaviors and when and how Activities after a Merge GW change state. How is a Start or Intermediate Event state with a None trigger different from a transfer of flow control by means of a token? There are connections between state transitions and “flow” as stated, for example, in the ConditionType Attribute where token flow is said to occur when the (source) Activity State goes to Completed. Are there rules relating the generation or consumption of tokens to the state transitions?
-
Reported: BPMN 1.0b1 — Fri, 1 Sep 2006 04:00 GMT
-
Disposition: Resolved — BPMN 1.1
-
Disposition Summary:
Suggested Resolution:
Close, No Change: This issue is out of scope for the RTF and will be addressed by the response to
the BPMN 2.0 RFP.
Revised Text: None
Disposition: Closed, deferred -
Updated: Fri, 6 Mar 2015 20:57 GMT