-
Key: BPMN11-37
-
Legacy Issue Number: 9883
-
Status: closed
-
Source: Agile Enterprise Design ( Mr. Fred A. Cummins)
-
Summary:
Issue: Link does not have clear semantics. Not clear if it is graphical only (for connecting off page or cross page lines, or has execution semantics. Also, it is not clear what types of elements can be linked. Need to clarify semantics for BPDM. Proposed solution (FTF discussion) Link is a graphical convenience for connecting two points on a graphical representation of a process. The points must be within a single pool and the name/identifier must be unique within the pool. It is only valid where a line without the link(s) would be valid.
-
Reported: BPMN 1.0b1 — Wed, 5 Jul 2006 04:00 GMT
-
Disposition: Resolved — BPMN 1.1
-
Disposition Summary:
see above
-
Updated: Fri, 6 Mar 2015 20:57 GMT