-
Key: BPMN11-16
-
Legacy Issue Number: 9461
-
Status: closed
-
Source: BPM Advantage Consulting ( Dr. Stephen White)
-
Summary:
We should clarify the nature of BPMN. If BPMN is just a notation, then Section 2 (BPMN Overview) should be specifically state this and also contrast a notation from other types of process specifications. If BPMN is not just a notation, then this should likewise be stated and its scope and purpose should be made clear.
-
Reported: BPMN 1.0b1 — Fri, 17 Mar 2006 05:00 GMT
-
Disposition: Resolved — BPMN 1.1
-
Disposition Summary:
see above
-
Updated: Fri, 6 Mar 2015 20:57 GMT