BPMN 1.1 NO IDEA Avatar
  1. OMG Issue

BPMN11 — fundamental semantic model of token flows

  • Key: BPMN11-15
  • Legacy Issue Number: 9376
  • Status: closed  
  • Source: me.com ( Frank McCabe)
  • Summary:

    Currently there is no description of the fundamental semantic model of token flows in the spec. Clearly it is based on a variety of petri net; however a description of the particular semantics assumed in BPMN could be very useful in reading the spec. Such a description should be formal in the sense that it should be mathematically clear what the procedural semantics of BPMN is

  • Reported: BPMN 1.0b1 — Thu, 23 Feb 2006 05:00 GMT
  • Disposition: Resolved — BPMN 1.1
  • Disposition Summary:

    Suggested Resolution:
    Close, No Change: This issue is out of scope for the RTF and will be addressed by the response to
    the BPMN 2.0 RFP.
    Revised Text: None
    Disposition: Closed, deferred

  • Updated: Fri, 6 Mar 2015 20:57 GMT