-
Key: BPMN11-15
-
Legacy Issue Number: 9376
-
Status: closed
-
Source: me.com ( Frank McCabe)
-
Summary:
Currently there is no description of the fundamental semantic model of token flows in the spec. Clearly it is based on a variety of petri net; however a description of the particular semantics assumed in BPMN could be very useful in reading the spec. Such a description should be formal in the sense that it should be mathematically clear what the procedural semantics of BPMN is
-
Reported: BPMN 1.0b1 — Thu, 23 Feb 2006 05:00 GMT
-
Disposition: Resolved — BPMN 1.1
-
Disposition Summary:
Suggested Resolution:
Close, No Change: This issue is out of scope for the RTF and will be addressed by the response to
the BPMN 2.0 RFP.
Revised Text: None
Disposition: Closed, deferred -
Updated: Fri, 6 Mar 2015 20:57 GMT