VDML11 — Incomplete statement on the use of resources

  • Key: VDML11-17
  • Status: closed  
  • Source: VDMbee ( Mr. Henk de Man)
  • Summary:

    In sub-clause 7.1.11 (Resources and Stores), page 22, it says: “The cumulative duration of these uses will determine the consumption of available resource time. This, along with the rate of production, will determine if the Pool of resources will always have resources available or will introduce some additional wait-time for assignment of a resource.”. This only talks about assigning a resource. But before it can be assigned, one may need to wait till it gets released. Can this be worked into the sentence, to make it better reflecting that also.

  • Reported: VDML 1.0 — Tue, 14 Nov 2017 16:34 GMT
  • Disposition: Resolved — VDML 1.1
  • Disposition Summary:

    Make statement about resources complete

    Make statement about the use of resources more complete, referring also to the concept of releasing of a resource.

  • Updated: Tue, 10 Jul 2018 14:22 GMT