-
Key: UMLTP23-19
-
Status: closed
-
Source: Lockheed Martin ( Ms. Annemarie Kibbe)
-
Summary:
Figure 7.2 seems to imply that test requirements are derived from System requirements. Can we clarify the relationship between SysML requirements and UTP test requirements?
-
Reported: UTP2 2.2b1 — Sat, 23 Dec 2023 03:27 GMT
-
Disposition: Closed; Out Of Scope — UTP2 2.3b1
-
Disposition Summary:
Harmonization of UTP 2.x and SysMLv2 is out of scope
RTF agreed to close this issue because the harmonization of SysMLv2 and UTP 2.x is out of scope.
-
Updated: Mon, 24 Mar 2025 13:34 GMT