-
Key: UML14-435
-
Legacy Issue Number: 6608
-
Status: closed
-
Source: France Telecom R&D ( Mariano Belaunde)
-
Summary:
According to the metamodel, a transition may have a guard and a trigger. However the specification
does not say how to draw a transition that has both. Should we put the guard, (1) near the arrow
which is before the "input" symbol representing the trigger signal, or (2) near the arrow which is after
the "input" symbol or (3) inside the symbol representing the trigger? -
Reported: UML 1.5 — Wed, 12 Nov 2003 05:00 GMT
-
Disposition: Resolved — UML 1.4.2
-
Disposition Summary:
see above
-
Updated: Fri, 6 Mar 2015 20:58 GMT
UML14 — Notation when guards are used in conjunction with triggers in transitions
- Key: UML14-435
- OMG Task Force: UML 1.4 RTF