UML 1.4 NO IDEA Avatar
  1. OMG Issue

UML14 — Question about InterruptibleActivityRegion

  • Key: UML14-295
  • Legacy Issue Number: 6247
  • Status: closed  
  • Source: oose Innovative Informatik eG ( Mr. Tim Weilkiens)
  • Summary:

    I am not sure about the semantics of the InterruptibleActivityRegion.

    If I have such a region with an Accept Event Action to wait for an
    event to terminate the region, what happens if there is no token
    flow within the region, but the event occurs?

    I think the Accept Event Action is active. I did not found another
    statement in the specification. That means that all outgoing
    egdes get tokens after event occurence.

    Normally that is not the semantic the modeler wants. Nothing should happen
    if there is no token flow in the activity region.

  • Reported: UML 1.5 — Thu, 11 Sep 2003 04:00 GMT
  • Disposition: Resolved — UML 1.4.2
  • Disposition Summary:

    see above

  • Updated: Fri, 6 Mar 2015 20:58 GMT