UAF 1.3b1 RTF Avatar
  1. OMG Issue

UAF13 — Arch Mgmt Roadmaps View

  • Key: UAF13-68
  • Status: closed  
  • Source: Aerospace Corporation ( Dr. James Martin)
  • Summary:

    Should be more than indication of ToBe or not ToBe. Should be a timeline of planned/expected evolution of the architecture IAW defined
    states and transitions in States view. Versions should correspond to which capabilities, missions, actual measurements, etc. will be achieved for that version.

  • Reported: UAF 1.2 — Wed, 1 Jun 2022 13:39 GMT
  • Disposition: Deferred — UAF 1.3b1
  • Disposition Summary:

    UAF RTF 1.3 scope is limited to Mission Engineering only

    Out of scope for 1.3

  • Updated: Mon, 24 Mar 2025 13:35 GMT
  • Attachments: