Summary:
BNF production is missing for n-ary connection def and connection usage as in examples shown in the representative notation table in 7.13.1 Connections Overview. Must be fixed in 8.2.3.13.
Check all examples of n-ary connections (including causation and requirements derivation) to replace arrowheads with bolded end names. Connections of 3 or more ends only have target ends, no source ends, see KerML spec clause 7.4.5.
-
Reported: SysML 2.0a1 — Thu, 27 Apr 2023 12:19 GMT
-
Disposition: Closed; No Change — SysML 2.0b4
-
Disposition Summary:
Missing graphical notation for n-ary connection def and usage
The issue was already addressed and resolved as part of resolution
SYSML2-277for issueSYSML2-47in Ballot #5 of the SYSML2 FTF. No further updates are needed.However, a graphical BNF production for n-ary ConnectionDefinition is still missing, and raised in
SYSML2_-247. -
Updated: Sat, 19 Jul 2025 19:24 GMT
-
Attachments:
- DerivedRequirement-Graphical-Notation-Tutorial-p95.png 191 kB (image/png)
SYSML2_ — Missing graphical notation for n-ary connection def and usage
- Key: SYSML2_-23
- OMG Task Force: Systems Modeling Language (SysML) 2.0 FTF 2