-
Key: SYSML2_-142
-
Status: closed
-
Source: International Business Machines ( Mr. Eran Gery)
-
Summary:
Graphical BNF specifies a flow connection. It is not clearly mapped to a semantic language concept. Should it be merged with a message specified as part of occurences?
-
Reported: SysML 2.0a1 — Wed, 18 Oct 2023 11:15 GMT
-
Disposition: Closed; No Change — SysML 2.0b4
-
Disposition Summary:
No longer relevant
This issue is subsumed by issue
SYSML2-557, which was already resolved by SysML v2 FTF1 as part of the resolution ofSYSML2-59and included in the Beta 2 specification. -
Updated: Sat, 19 Jul 2025 19:24 GMT
SYSML2_ — GBNF for flow connection not mapped to semantics
- Key: SYSML2_-142
- OMG Task Force: Systems Modeling Language (SysML) 2.0 FTF 2