SysML 2.0b2 FTF Avatar
  1. OMG Issue

SYSML2 — ObjectFlows targeting a final node or a activity parameter node cannot be mapped

  • Key: SYSML2-238
  • Status: closed  
  • Source: oose Innovative Informatik eG ( Mr. Tim Weilkiens)
  • Summary:

    All target nodes of object flows are handled the same, but activity final nodes are not covered yet, flow final nodes are mapped to a library element, and activity parameter nodes are ignored by the transformation and replaced by the parameter. The object flow mapping must consider the handling of these cases.

  • Reported: SysML 2.0a1 — Thu, 22 Jun 2023 16:13 GMT
  • Disposition: Resolved — SysML 2.0b2
  • Disposition Summary:

    Consider object flow targets FlowFinalNode, ActivityFinalNode, and ActivityParameterNode

    The resolution adds special cases for the three activity nodes.

  • Updated: Tue, 1 Jul 2025 14:48 GMT