PSSM 1.0 FTF Avatar
  1. OMG Issue

PSSM_ — In Testcase "Entering 011" T3 is not a completion transition

  • Key: PSSM_-7
  • Status: closed  
  • Source: oose Innovative Informatik eG ( Mr. Axel Scheithauer)
  • Summary:

    The text says:

    The S1 completion event is then used to trigger transition T3.

    Actually transition T3 has an event "Continue" in the diagram and will not react to a completion event.

  • Reported: PSSM 1.0b1 — Tue, 3 Apr 2018 15:35 GMT
  • Disposition: Resolved — PSSM 1.0
  • Disposition Summary:

    Resolution of issue PSSM-7

    Entering 011 has a transition T3 that is not a completion transition. The text describing the interpretation of this transition is inconsistent since it considers T3 has a completion transition.

    This issue is only related to the text. Indeed the table describing each RTC step performed during the execution of the test is consistent with the model (i.e., it consider T3 as a transition triggered by the acceptance of a Continue event occurrence).

  • Updated: Mon, 1 Apr 2019 18:19 GMT