OARIS3 — Description of Manage_Transmission_Sectors protocol is inconsistent

  • Key: OARIS3-58
  • Status: open  
  • Source: BAE SYSTEMS ( Mr. Simon Mettrick)
  • Summary:

    The description of the interface states that
    "It is the CMS's responsibility to initiate the determination of initial state by making a request for information to the subsystem."
    However, there is no operation defined to request information from the subsystem.
    (Note: the protocol was probably simplified in working towards the v1.0 submission without revising the overall description of this particular interface).

  • Reported: OARIS 2.0 — Wed, 28 Sep 2022 10:59 GMT