-
Key: OARIS3-29
-
Status: closed
-
Source: RTX ( Dr. David Bainbridge)
-
Summary:
The specification and the file Perform_Splash_Spotting.idl have multiple misspellings of spotting as "splotting". For example, confirm_reposition_splash_splotting_area, receive_splash_splotting_area_position, receive_splash_splotting_area_track.
-
Reported: OARIS 2.0b2 — Wed, 27 Sep 2023 18:08 GMT
-
Disposition: Resolved — OARIS 3.0b2
-
Disposition Summary:
Correct instances of splotting
Correct instances of splotting to spotting
-
Updated: Fri, 20 Dec 2024 23:14 GMT
-
Attachments:
- Perform Splash Spotting - Activate Splash Spotting Area by Fire Control Track.svg 15 kB (image/svg+xml)
- Perform Splash Spotting - Activate Splash Spotting Area by Position.svg 15 kB (image/svg+xml)
- Perform Splash Spotting - Re-position Splash Spotting Area.svg 14 kB (image/svg+xml)
OARIS3 — multiple misspellings of "spotting" as "splotting"
- Key: OARIS3-29
- OMG Task Force: Open Architecture Radar Interface Standard (OARIS) 3.0 FTF