-
Key: OARIS21-4
-
Status: open
-
Source: BAE SYSTEMS ( Mr. Simon Mettrick)
-
Summary:
The description of the interface states that
"It is the CMS's responsibility to initiate the determination of initial state by making a request for information to the subsystem."
However, there is no operation defined to request information from the subsystem.
(Note: the protocol was probably simplified in working towards the v1.0 submission without revising the overall description of this particular interface). -
Reported: OARIS 2.0 — Wed, 28 Sep 2022 10:59 GMT
-
Updated: Wed, 28 Sep 2022 14:55 GMT
OARIS21 — Description of Manage_Transmission_Sectors protocol is inconsistent
- Key: OARIS21-4
- OMG Task Force: Open Architecture Radar Interface Standard (OARIS) 2.1 RTF