-
Key: OARIS21-20
-
Status: closed
-
Source: BAE SYSTEMS ( Mr. Simon Mettrick)
-
Summary:
The Exchange Heartbeat use case supports assurance cases relating to runtime software integrity, in particular that critical functionality continues to be available and has not failed silently.
For the DDS PSM this is currently mapped to the built-in DDS API, but the on_requested_deadline_missed requires a suitable topic definition (which could/should be provided by the Exchange Heartbeat use case). -
Reported: OARIS 2.0b2 — Thu, 23 Feb 2023 14:42 GMT
-
Disposition: Deferred — $issue.fixedSpecification.name
-
Disposition Summary:
This Issue was not resolved in this Task Force and was automatically deferred to the next Task Force
-
Updated: Tue, 9 Jul 2024 14:40 GMT
OARIS21 — Heartbeat required as the basis for on_requested_deadline_missed for DDS PSM
- Key: OARIS21-20
- OMG Task Force: Open Architecture Radar Interface Standard (OARIS) 2.1 RTF