Summary:
The Date-Time Vocabulary has multiple concepts about amounts of time (duration, duration value), and locations in time (time interval, time point, time point set, time period, time coordinate), but very little guidance as to which of these concepts should be the basis for application business vocabularies. DTV should add a rationale section or additional commentary in Annex C to explain which concepts should be used for what purposes in business vocabularies.
Table C.1 has a reference to a concept 'date' that does not exist.
-
Reported: DTV 1.0 — Sun, 6 Oct 2013 04:00 GMT
-
Disposition: Closed; No Change — DTV 1.3
-
Disposition Summary:
Issue does not reflect revision of Annex C
This issue was substantially addressed in v1.2 with the rewrite of Annex C as the Guidelines for Business Use. Further work on that Annex may be appropriate, but only if issues that cite specific weaknesses are raised.
-
Updated: Tue, 12 Jul 2016 14:45 GMT
DTV13 — Inadequate guidance for application vocabularies
- Key: DTV13-81
- OMG Task Force: DateTime Vocabulary (DTV) 1.3 RTF