-
Key: BPMN12-8
-
Legacy Issue Number: 13922
-
Status: open
-
Source: SunGard ( Roy Massie)
-
Summary:
Figures 10.18 and 10.19 are presented as though they are logical equivalents in the description above 10.19. However, In Figure 10.19 it is possible both Condition 1 and 2 could be true causing all three transitions to be traversed. This is not possible in 10.18 because of the exclusive gate. To make the two diagrams behave the same, the default slash should be added to the Condition 1 transition coming from the Inclusive gate on diagram 10.19. This will insure either Condition 1 XOR Condition 2 is traversed, but not both inclusively as is possible in the current spec. If the diagrams are not to be taken as logical equivalents, the text just under Figure 10.18 should be changed to make this clearer and the Activity names should be made different so equivalence is not implied.
-
Reported: BPMN 1.2 — Thu, 7 May 2009 04:00 GMT
-
Updated: Fri, 6 Mar 2015 20:57 GMT
BPMN12 — Figures 10.18 and 10.19 are presented as though they are logical equivalents in the description above 10.19.
- Key: BPMN12-8
- OMG Task Force: BPMN 1.2 RTF