BPMN 1.1 NO IDEA Avatar
  1. OMG Issue

BPMN11 — Should Exception Events be allowed to have no Outgoing Sequence Flow?

  • Key: BPMN11-84
  • Legacy Issue Number: 10520
  • Status: closed  
  • Source: BPM Advantage Consulting ( Dr. Stephen White)
  • Summary:

    Exception Events (i.e., attached to an activity) are required to have an outgoing Sequence Flow. However, if the model being created is simple and does not use Start and End Events (see figure below), and the exception is extended to end the process, should we allow the modeler to forgo the use of Start and End Events (which would be currently required)?

  • Reported: BPMN 1.0 — Fri, 8 Dec 2006 05:00 GMT
  • Disposition: Resolved — BPMN 1.1
  • Disposition Summary:

    see above

  • Updated: Fri, 6 Mar 2015 20:57 GMT